Projects
ANPZ Piping works
Enpetrol Management Experience
| Project Name | Piping works on the piperack |
|---|---|
| Owner | Atyrau Refinery – ANPZ |
| Client | Sinopec Engineering – KazStroyService KSS |
| Location | Atyrau – Kazakhstan |
| Duration | 4 months |
| Scope | Fabrication and installation of various diameters of pipes on the piperack, interconnection piping, tank farm area piping. |